Abstract:
南水北调调西线工程线路地层倾角陡、沟谷纵横、地质构造复杂、隧道长,埋深大,同时要对1000 m以内的构造、岩溶、岩层划分等进行地质超前预报,利用以往的超前预报方法无法满足工程施工的要求.对于深长埋隧道断层的施工地质超前预报,本文使用CSAMT法探测技术,并进行了近场校正、各向异性校正、静态校正、分辨能力校正和联合反演等手段,进行了实际探测和对比分析,并取得了较好的探测效果.