Indexed by:
Abstract:
In this paper, a comprehensive optimization problem is developed for a composite of an assembly line reconfiguration problem with multiple lines and a capacitated lot-sizing problem. Multiple products are considered, whose demand is uncertain and is dynamically forecasted. The production planner is assumed to be risk-averse, and decisions are made contingent upon the risk preference. To model the problem, a stochastic program with two stages is utilized. A solution approach is devised using a divide-and-conquer algorithm, which incorporates a set of valid inequalities. The effectiveness and efficiency of the proposed solution approach are assessed through a series of computational tests. Finally, a case study focusing on an engine production process is presented, leading to the derivation of several valuable insights.
Keyword:
Reprint Author's Address:
Email:
Source :
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE
ISSN: 0305-0483
Year: 2024
Volume: 127
6 . 9 0 0
JCR@2022
Cited Count:
SCOPUS Cited Count: 6
ESI Highly Cited Papers on the List: 0 Unfold All
WanFang Cited Count:
Chinese Cited Count:
30 Days PV: 1
Affiliated Colleges: