• 综合
  • 标题
  • 关键词
  • 摘要
  • 学者
  • 期刊-刊名
  • 期刊-ISSN
  • 会议名称
搜索

作者:

Zhu, Xiangdong (Zhu, Xiangdong.) | Xiao, Xiang (Xiao, Xiang.) | Wu, Chaoran (Wu, Chaoran.)

收录:

CPCI-S CPCI-SSH

摘要:

The urban rail transit system is widely adopted in big cities for its large transit capacity, fast speed, low power consumption, and comfortable riding experience. But recently frequent metro accidents appear and the subsequent social impact is very bad, which remind us of the risk in the rail transit system. Therefore, this paper analyzes the risk factors in rail transit project, divides them into different phases, and then specifies the risk in different phases. Then, an AHP-based fuzzy comprehensive evaluation model is developed for the urban rail transit system based on the identified risk factors.

关键词:

Fuzzy comprehensive evaluation Risk assessment Risk classification Analytic hierarchy process

作者机构:

  • [ 1 ] [Zhu, Xiangdong]Beijing Univ Technol, Sch Econ & Management, Beijing, Peoples R China
  • [ 2 ] [Xiao, Xiang]Beijing Univ Technol, Sch Econ & Management, Beijing, Peoples R China
  • [ 3 ] [Wu, Chaoran]Beijing Univ Technol, Sch Econ & Management, Beijing, Peoples R China

通讯作者信息:

  • [Xiao, Xiang]Beijing Univ Technol, Sch Econ & Management, Beijing, Peoples R China

查看成果更多字段

相关关键词:

相关文章:

来源 :

LTLGB 2012: PROCEEDINGS OF INTERNATIONAL CONFERENCE ON LOW-CARBON TRANSPORTATION AND LOGISTICS, AND GREEN BUILDINGS. VOL 1

年份: 2013

页码: 539-546

语种: 英文

被引次数:

WoS核心集被引频次: 0

SCOPUS被引频次:

ESI高被引论文在榜: 0 展开所有

万方被引频次:

中文被引频次:

近30日浏览量: 2

归属院系:

在线人数/总访问数:588/3891206
地址:北京工业大学图书馆(北京市朝阳区平乐园100号 邮编:100124) 联系我们:010-67392185
版权所有:北京工业大学图书馆 站点建设与维护:北京爱琴海乐之技术有限公司