Indexed by:
Abstract:
The features of a new type of continuous bridge suspended by triangle frame are introduced in this paper. In view of the segmental cantilever construction method engaged in main girder construction, we put forward to the method of pre-camber setting and the calculation of formwork elevation and field measurement of displacement.
Keyword:
Reprint Author's Address:
Source :
ADVANCES IN CIVIL ENGINEERING, PTS 1-6
ISSN: 1022-6680
Year: 2011
Volume: 255-260
Page: 811-,
Language: English
Cited Count:
WoS CC Cited Count: 0
SCOPUS Cited Count:
ESI Highly Cited Papers on the List: 0 Unfold All
WanFang Cited Count:
Chinese Cited Count:
30 Days PV: 1