收录:
摘要:
Building a simulation network of road based on VISSIM and road planning of Guangzhou bio-island. According to the field data and statistic method to calculate the confidence interval of the calibration Parameters, at the same time, calibrating and verifying the simulation model, then using the simulation model calibrated to play the simulation and collect the traffic flow data, setting up four traffic organization projects, using improved AHP method to evaluate the effect of whole road network based on the data collected on the simulation network, then getting the sequence of all kinds of traffic organization projects.
关键词:
通讯作者信息:
电子邮件地址: