• 综合
  • 标题
  • 关键词
  • 摘要
  • 学者
  • 期刊-刊名
  • 期刊-ISSN
  • 会议名称
搜索

作者:

Huang, Chun (Huang, Chun.) | W., Li (W., Li.) | W., Lu (W., Lu.) | F., Xue (F., Xue.) | M., Liu (M., Liu.) | Z., Liu (Z., Liu.)

收录:

EI Scopus SCIE

摘要:

Tower crane scheduling is a classic conundrum. It is further complicated to prevent collisions and reduce idle transportation time among multiple overlapping tower cranes. Unlike previous research attempts, this study aims to provide an optimal solution to this multiple crane service scheduling problem (MCSSP). Firstly, the MCSSP was translated to a Mixed Integer Linear Programming (MILP) model. Then, the model was optimized by 1) distributing the lifting requests in overlapping areas to the proper tower cranes; 2) selecting the appropriate supply location to serve each lifting request; and 3) arranging the lifting sequences of each tower crane to complete the requests. Compared with previous methods, the proposed MILP model (solved using Gurobi™) can result in the saving of 6.54%–18.07% of total operation costs meanwhile achieving the non-collision goal. The findings of this research can be deployed in optimizing efficiency and safety in the real-life scheduling of multiple overlapping tower cranes. © 2021 Elsevier B.V.

关键词:

Scheduling Efficiency Towers Integer programming Tower cranes

作者机构:

  • [ 1 ] [Huang, Chun]College of Architecture and Civil Engineering, Beijing University of Technology, Chaoyang, Beijing; 100124, China
  • [ 2 ] [Huang, Chun]The Key Laboratory of Urban Security and Disaster Engineering of the Ministry of Education, Beijing University of Technology, Beijing; 100124, China

通讯作者信息:

电子邮件地址:

查看成果更多字段

相关关键词:

相关文章:

来源 :

Automation in Construction

ISSN: 0926-5805

年份: 2021

卷: 127

1 0 . 3 0 0

JCR@2022

ESI学科: ENGINEERING;

ESI高被引阀值:87

JCR分区:1

被引次数:

WoS核心集被引频次: 0

SCOPUS被引频次: 15

ESI高被引论文在榜: 0 展开所有

万方被引频次:

中文被引频次:

近30日浏览量: 0

在线人数/总访问数:825/3898927
地址:北京工业大学图书馆(北京市朝阳区平乐园100号 邮编:100124) 联系我们:010-67392185
版权所有:北京工业大学图书馆 站点建设与维护:北京爱琴海乐之技术有限公司