• 综合
  • 标题
  • 关键词
  • 摘要
  • 学者
  • 期刊-刊名
  • 期刊-ISSN
  • 会议名称
搜索

作者:

Gu Sheng-Bo (Gu Sheng-Bo.) | Wang Shu-Ying (Wang Shu-Ying.) (学者:王淑莹) | Peng Yong-Zhen (Peng Yong-Zhen.) (学者:彭永臻)

收录:

PKU PubMed CSCD

摘要:

In order to test the start-up and maintain method for short-cut advanced nitrogen removal process at low temperature, this study used a pilot-scale SBR process with a working volume of 7.0 m3 to treat domestic wastewater. Real-time control strategy based on blower frequency (BF) and pH was applied to control the pilot-scale SBR process. Results showed that short-cut nitrification process achieved within 50 days at low temperature (11-16 degrees C), and the nitrite accumulation rate (NAR) of SBR process increased from 19.8% to 90%. Short-cut nitrification process in pilot-scale SBR was maintained for as long as 550 days in the temperature range of 9-28 degrees C, and NAR was maintained above 95%. Meanwhile, the total nitrogen (TN) in effluent was 3 mg x L(-1) and the TN removal efficiency was above 95%. Therefore, it is feasible to start-up and maintain the short-cut advanced nitrogen removal process under low temperature condition in the SBR process.

关键词:

作者机构:

  • [ 1 ] [Gu Sheng-Bo]Key Laboratory of Beijing Water Quality Science and Water Environment Recovery Engineering, College of Environmental and Energy Engineering, Beijing University of Technology, Beijing 100124, China. gushengbo@bmedi.cn

通讯作者信息:

电子邮件地址:

查看成果更多字段

相关关键词:

相关文章:

来源 :

Huanjing kexue

ISSN: 0250-3301

年份: 2013

期: 8

卷: 34

页码: 3164-70

被引次数:

WoS核心集被引频次: 0

SCOPUS被引频次:

ESI高被引论文在榜: 0 展开所有

万方被引频次:

中文被引频次:

近30日浏览量: 2

在线人数/总访问数:1346/2910606
地址:北京工业大学图书馆(北京市朝阳区平乐园100号 邮编:100124) 联系我们:010-67392185
版权所有:北京工业大学图书馆 站点建设与维护:北京爱琴海乐之技术有限公司