收录:
摘要:
In an assembly line system, the production process may suffer a sudden disruption, and this may call for rebalancing. In this paper, the assembly line rebalancing problem is set in a multiperiod context considering stochastic processing times. It is assumed that there are specific moments in time chosen for rebalancing the line (if necessary). Two policies, a periodic rebalancing policy and a data-driven rebalancing policy, are proposed to solve the rebalancing problem. The goal is to minimize the total cost, which include production and rebalancing costs. An empirical study is conducted, and several results are achieved: rebalancing an assembly line is sometimes worse than not rebalancing it; rebalancing an assembly line too often may not be beneficial; and the new data-driven policy introduced is better than the plain multiperiod policy.
关键词:
通讯作者信息:
电子邮件地址:
来源 :
INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING
ISSN: 0951-192X
年份: 2021
期: 10-11
卷: 35
页码: 1059-1076
4 . 1 0 0
JCR@2022
ESI学科: ENGINEERING;
ESI高被引阀值:87
JCR分区:2
归属院系: