收录:
摘要:
Based on the geological conditions of Shenzhen region, the experience of traditional single mode shield tunneling was summarized. Studied the adaptability and technical characteristics of shield tunneling, proposed the concept of EPB-TBM dual mode shield tunneling machine, and fully applied it to the fourth phase of Shenzhen Metro project. This paper analyzes and studies the practical applications of multiple engineering projects, summarizes and analyzes the efficiency, consumption of cutter tool, mode switching, economy, and existing problems of dual mode shield tunneling, and puts forward relevant suggestions to provide reference for similar projects in the future. © 2024 The Author(s).
关键词:
通讯作者信息:
电子邮件地址:
来源 :
年份: 2024
页码: 2148-2156
语种: 英文
归属院系: