As the Gongzhufen station of Beijing Metro line 10 closely passes under the existing station of line 1 and it required floor settlement of existing station to be no more than 3mm, in this case a new method combining CRD (flat top and straight wall) and multiple pre-struts was firstly proposed and adopted. Based on field monitoring, the paper also studied the deformation characteristics of the existing station, analyzed the reasons for settlement, put up relevant countermeasures and verified the reliability and security of the new method. ©, 2015, Editorial Office of 'Modern Tunnelling Technology'. All right reserved.