• 综合
  • 标题
  • 关键词
  • 摘要
  • 学者
  • 期刊-刊名
  • 期刊-ISSN
  • 会议名称
搜索

作者:

Cheng, Xuan-Sheng (Cheng, Xuan-Sheng.) | Wang, Jian-Hua (Wang, Jian-Hua.)

收录:

EI Scopus PKU CSCD

摘要:

In order to determine the optimal construction method for loess tunnels with super-large cross-section, considering the elastoplastic constitutive relation between tunnel lining and soil and using FEM software ANSYS, a case of loess tunnel with super-large cross-section is calculated by means of six kinds of methods, which are CD method, CRD method, single-wall excavation method, double-wall excavation method, pre-excavation core soil method and pre-retaining core soil method. By comparing the displacement results of control nodes, the results show that, for the loess tunnel with super-large cross-section, the CRD method is the optimal one. When temporary support is added in construction, the central temporary support has great influence on the stability of surrounding rock, and equivalent plastic strain is increased by about 20% before and after demolition of the temporary support.

关键词:

Excavation Geotechnical engineering Sediments Soils Tunnels

作者机构:

  • [ 1 ] [Cheng, Xuan-Sheng]School of Civil Engineering, Lanzhou University of Technology, Lanzhou 730050, China
  • [ 2 ] [Cheng, Xuan-Sheng]Key Laboratory of Urban Security and Disaster Engineering of Education, Beijing University of Technology, Beijing 100124, China
  • [ 3 ] [Wang, Jian-Hua]School of Civil Engineering, Lanzhou University of Technology, Lanzhou 730050, China

通讯作者信息:

电子邮件地址:

查看成果更多字段

相关关键词:

相关文章:

来源 :

Chinese Journal of Geotechnical Engineering

ISSN: 1000-4548

年份: 2013

期: SUPPL.1

卷: 35

页码: 82-89

被引次数:

WoS核心集被引频次: 0

SCOPUS被引频次:

ESI高被引论文在榜: 0 展开所有

万方被引频次:

中文被引频次:

近30日浏览量: 2

在线人数/总访问数:6061/2941231
地址:北京工业大学图书馆(北京市朝阳区平乐园100号 邮编:100124) 联系我们:010-67392185
版权所有:北京工业大学图书馆 站点建设与维护:北京爱琴海乐之技术有限公司