收录:
摘要:
The start-up of nitrosationin SBR was analyzed with different seeding sludge strategy and influent. The results showed the quickly start up of nitrosation when seeding nitrosation sludge with low dissolved oxygen (DO=0.30 mg/L) and no accumulation of nitrite when seeding nitrification sludge after 29days (58 cycels) operation.The rate of nitrosation could be above 60% in 27days (54 cycles) when alternative high-low dissolved oxygen was adopted.No nitrite was accumulated when seeding nitrification sludge under low dissolved oxygen (DO=0.30 mg/L), with the effluent of A/O biological phosphorus removal process with the C/N of 0.40-0.93 after 32 cycles, while the start-up of nitrosation was realized with the influent from septic tanks with the C/N of 3.50-5.34.
关键词:
通讯作者信息:
电子邮件地址: