收录:
摘要:
Based on the deep excavation of GTFC Plaza, the deformation rules and change form of internal force of pile-anchor system which is applied in backfilling areas are discussed, especially the individual position of pile-anchor system being abutted the tunnel and shaft of subway. The analysis of this project case may provide some experience and reference for similar projects.
关键词:
通讯作者信息:
电子邮件地址:
来源 :
Chinese Journal of Geotechnical Engineering
ISSN: 1000-4548
年份: 2012
期: SUPPL.
卷: 34
页码: 358-363