收录:
摘要:
At present, long span cable-stayed bridge seismic performance study only takes its main bridge as an analysis object. There are few reports about earthquake impact between a cable-stayed bridge and its approach-bridge. Taking a Jiu-Jiang big bridge as an example, the impact analysis model between a cable-bridge and its approach-bridge was built. The impact influence factors between them were systematically studied. The influence factors included site-type, height of gravity center, approach-bridge structure form. Some significant conclusions were obtained. They provided a reference for similar project a seismic designing.
关键词:
通讯作者信息:
电子邮件地址: