To improve the scientific management level and effluent quality of a municipal wastewater treatment plant (WWTP), the relationship between the phosphorus removal approach and operating parameters of the A/A/O technology was analyzed by sampling and analyzing samples from the treatment technology process of a WWTP in Beijing, and also the phosphorus material balance was assessed for the sewage treatment system. The results showed that the denitrifying phosphorus removal played remarkably a role for phosphorus removal in the anoxic zone of A/A/O process. The absorption of phosphorus in anoxic zone had exceeded the quantity in the oxic zone. The nitrate concentration in the returned nitrifying liquid had an influence on the denitrifying phosphorus removal. The relationship between phosphorus removal and sludge load, sludge retain time (SRT) showed negative correlation. When the sludge load was about 0.15 kg/(kg·d) and the SRT was about 10-12 d in A/A/O process, the phosphorus removal rate was up to 88%. There was also a negative correlation relationship between the phosphorus accumulation and the sludge emission capacities in the wastewater treatment system. When the sludge emission capacities were controlled to 2.0-2.5 percent inflow of the treatment plant, the phosphorus removal efficiency could be kept on stable and economic status.
关键词:
通讯作者信息:
电子邮件地址:
来源 :
Journal of Harbin Institute of Technology
ISSN: 0367-6234
年份: 2011
期: 10
卷: 43
页码: 129-133