• 综合
  • 标题
  • 关键词
  • 摘要
  • 学者
  • 期刊-刊名
  • 期刊-ISSN
  • 会议名称
搜索

作者:

Zhang, Shi-Wen (Zhang, Shi-Wen.) | Liu, Xiao-Ming (Liu, Xiao-Ming.) (学者:刘小明)

收录:

EI Scopus PKU CSCD

摘要:

The paper brought forward a rapid risk analysis method of Highway BOT Project based on using the datum of feasibility reports, which would be helpful for decision-makers and assessment professionals. From the risk of BOT project, the authors discussed the difference between the project assessment and feasibility. Especially, the authors analyzed the difference in cost components, benefit calculation, keeping away risks in details. Based on those analysis, the rapid risk analysis method was put forward so as to solve the problems, such as how to use the conclusions of feasibility reports to judge and guard against risks, how to gain the useful information and data from feasibility reports quickly. In addition, a case was also provided to explain how to use the method. The paper would be expected to be helpful for decision-makers and assessment professionals.

关键词:

Decision making Risk analysis Risk assessment Risks

作者机构:

  • [ 1 ] [Zhang, Shi-Wen]College of Architecture and Civil Engineering, Beijing University of Technology, Beijing 100124, China
  • [ 2 ] [Zhang, Shi-Wen]China Communications Construction Investment Company Limited, Beijing 100088, China
  • [ 3 ] [Liu, Xiao-Ming]College of Architecture and Civil Engineering, Beijing University of Technology, Beijing 100124, China

通讯作者信息:

电子邮件地址:

查看成果更多字段

相关关键词:

来源 :

Journal of Beijing University of Technology

ISSN: 0254-0037

年份: 2010

期: 1

卷: 36

页码: 51-57

被引次数:

WoS核心集被引频次: 0

SCOPUS被引频次:

ESI高被引论文在榜: 0 展开所有

万方被引频次:

中文被引频次:

近30日浏览量: 2

在线人数/总访问数:1103/2906148
地址:北京工业大学图书馆(北京市朝阳区平乐园100号 邮编:100124) 联系我们:010-67392185
版权所有:北京工业大学图书馆 站点建设与维护:北京爱琴海乐之技术有限公司