Fang, Jianghua (Fang, Jianghua.) | Zhang, Zhihong (Zhang, Zhihong.) (学者:张志红) | Zhang, Jingyu (Zhang, Jingyu.)

收录:

EI Scopus PKU CSCD

摘要:

Freezing reinforcement and mining excavation were jointly conducted in recovering a collapsed tunnel in Shanghai metro No.4 line. According to the basic theory and engineering experience of artificial freezing, freezing system and parameters for the recovering collapsed tunnel were determined. Forced thawing was implemented sequentially for different sub-regions. Fill grouting between the structure and the frozen wall and thaw-settlement compensation grouting were used for control of strata thaw settlement.

关键词:

Concrete construction Freezing Grouting Mortar Recovery Subways Thawing

作者机构:

  • [ 1 ] [Fang, Jianghua]Anhui University of Science and Technology, Huainan 232001, China
  • [ 2 ] [Zhang, Zhihong]Beijing University of Technology, Beijing 100124, China
  • [ 3 ] [Zhang, Jingyu]China Coal Special Constructional Engineering Company, Huaibei 235044, China

通讯作者信息:

电子邮件地址:

查看成果更多字段

相关关键词:

相关文章:

来源 :

China Civil Engineering Journal

ISSN: 1000-131X

年份: 2009

期: 8

卷: 42

页码: 124-128

被引次数:

WoS核心集被引频次: 0

SCOPUS被引频次:

ESI高被引论文在榜: 0 展开所有

万方被引频次:

中文被引频次:

近30日浏览量: 3

归属院系:

在线人数/总访问数:6024/2941194
地址:北京工业大学图书馆(北京市朝阳区平乐园100号 邮编:100124) 联系我们:010-67392185
版权所有:北京工业大学图书馆 站点建设与维护:北京爱琴海乐之技术有限公司