Freezing reinforcement and mining excavation were jointly conducted in recovering a collapsed tunnel in Shanghai metro No.4 line. According to the basic theory and engineering experience of artificial freezing, freezing system and parameters for the recovering collapsed tunnel were determined. Forced thawing was implemented sequentially for different sub-regions. Fill grouting between the structure and the frozen wall and thaw-settlement compensation grouting were used for control of strata thaw settlement.
关键词:
通讯作者信息:
电子邮件地址:
来源 :
China Civil Engineering Journal
ISSN: 1000-131X
年份: 2009
期: 8
卷: 42
页码: 124-128