• 综合
  • 标题
  • 关键词
  • 摘要
  • 学者
  • 期刊-刊名
  • 期刊-ISSN
  • 会议名称
搜索

作者:

Teng, Hai-Wen (Teng, Hai-Wen.) | Wang, Tao (Wang, Tao.) | Huo, Yu-Hui (Huo, Yu-Hui.) | Hao, Zhe (Hao, Zhe.)

收录:

EI Scopus PKU CSCD

摘要:

Ground settlement and tunnel stability problem caused by tunnel excavation are two key problems of subway tunnel construction. Based on the background of ShenYang subway No.1 Line, according to geological data, three dimension numerical model of tunnel excavation is established. To study soil settlement with excavation process more exactly, shotcrete and concrete liner are studied respectively. The relationship between soil settlement and excavation process by using different support thickness is established.

关键词:

Convergence of numerical methods Subways Tunneling (excavation) Tunnels Numerical models

作者机构:

  • [ 1 ] [Teng, Hai-Wen]College of Architecture and Civil Engineering, Beijing University of Technology, Beijing 100124, China
  • [ 2 ] [Wang, Tao]College of Architecture and Civil Engineering, Beijing University of Technology, Beijing 100124, China
  • [ 3 ] [Huo, Yu-Hui]Asia Pacific Institute of Construction Science Information, Beijing 100044, China
  • [ 4 ] [Hao, Zhe]College of Architecture and Civil Engineering, Shenyang University, Shenyang 110044, China

通讯作者信息:

电子邮件地址:

查看成果更多字段

相关关键词:

相关文章:

来源 :

Journal of Beijing University of Technology

ISSN: 0254-0037

年份: 2009

期: 8

卷: 35

页码: 1074-1079

被引次数:

WoS核心集被引频次: 0

SCOPUS被引频次:

ESI高被引论文在榜: 0 展开所有

万方被引频次:

中文被引频次:

近30日浏览量: 6

在线人数/总访问数:2716/4268449
地址:北京工业大学图书馆(北京市朝阳区平乐园100号 邮编:100124) 联系我们:010-67392185
版权所有:北京工业大学图书馆 站点建设与维护:北京爱琴海乐之技术有限公司