• 综合
  • 标题
  • 关键词
  • 摘要
  • 学者
  • 期刊-刊名
  • 期刊-ISSN
  • 会议名称
搜索

作者:

Zhang, Yin-Tao (Zhang, Yin-Tao.) | Tao, Lian-Jin (Tao, Lian-Jin.) (学者:陶连金) | Zhang, Fei-Jin (Zhang, Fei-Jin.) | Li, Xiao-Lin (Li, Xiao-Lin.)

收录:

EI Scopus PKU CSCD

摘要:

The metro tunnel of a newly constructed line that crosses underneath the tunnel of the existing line in Beijing has significant effects on the adjacent tunnels. Based on the FLAC numerical model and the stress release method, concerning on the settlement slot of the existing metro tunnel and steel tube pre-reinforced construction of the newly constructed line, the process of tunneling is simulated and the settlement of the influenced part of the existing line is obtained. The result is analyzed subsequently. The conclusions of this paper may help evaluate the security of the existing metro tunnel, control the construction process, and actualize the monitoring during tunneling.

关键词:

Construction Steel Stresses Subsidence Tunnels

作者机构:

  • [ 1 ] [Zhang, Yin-Tao]College of Architecture and Civil Engineering, Beijing University of Technology, Beijing 100022, China
  • [ 2 ] [Tao, Lian-Jin]College of Architecture and Civil Engineering, Beijing University of Technology, Beijing 100022, China
  • [ 3 ] [Zhang, Fei-Jin]Hainan Highway Survey and Design Institute, Haikou 570206, China
  • [ 4 ] [Li, Xiao-Lin]Beijing Urban Engineering Design and Research Institute Co. Ltd., Beijing 100037, China

通讯作者信息:

电子邮件地址:

查看成果更多字段

相关关键词:

来源 :

Journal of Beijing University of Technology

ISSN: 0254-0037

年份: 2007

期: 12

卷: 33

页码: 1273-1277

被引次数:

WoS核心集被引频次: 0

SCOPUS被引频次:

ESI高被引论文在榜: 0 展开所有

万方被引频次:

中文被引频次:

近30日浏览量: 2

在线人数/总访问数:700/2898308
地址:北京工业大学图书馆(北京市朝阳区平乐园100号 邮编:100124) 联系我们:010-67392185
版权所有:北京工业大学图书馆 站点建设与维护:北京爱琴海乐之技术有限公司