收录:
摘要:
Research on production scheduling for manufacturing cell based workshop is conducted. The scheduling system structure for manufacturing cell based workshop is established by using Multi-Agent technology. The system consists of Management Agent, Task Agent, and Manufacturing Cell Agent. The machining path is determined through the negotiation and communication of each Agents, and the communication between each Agents is achieved by the CORBA technology of OMG. The machining sequence and start time are determined by genetic algorithm (GA). The solution to machine tool failure, urgent task, and such abnormal affairs is proposed. The system can solve the dynamic scheduling problem for workshop based on manufacturing cell, and the best scheduling for task can be achieved. At last, a scheduling example is demonstrated.
关键词:
通讯作者信息:
电子邮件地址:
来源 :
Journal of Beijing University of Technology
ISSN: 0254-0037
年份: 2006
期: 8
卷: 32
页码: 730-736
归属院系: