收录:
摘要:
With the gradual increase of pumping construction of medium and high-rise buildings in China, the construction requirements for concrete pumping process are gradually improved. Based on a project in Wuhan, this paper applied BIM technology on the pumping concrete construction process. Through the use of several softwares, the optimization of pumping pipeline layout, simulation of construction schedule, and priority grouping of marked bends was achieved. The details of the concrete construction of concrete pumping using BIMtechnology were shown, providing a reference for the application of BIM technology in the field of pumping concrete. © Published under licence by IOP Publishing Ltd.
关键词:
通讯作者信息:
电子邮件地址: