收录:
摘要:
With the intensive development of metropolitan downtown areas, underground and above-ground space will be developed simultaneously. Taiyuan Metro Line 3 and Viaduct that is above-ground will be jointly built. This paper takes the co-construction of Tower Street metro station and Viaduct as the research object, a two dimensional finite difference element model is established by FLAC2D of soil—underground station- above-ground bridge. Site conditions of liquefaction and non-liquefaction when we use plain concrete and graded gravel soils as the materials of the conversion layer respectively are considered here, and the seismic response of subway station structure and conversion layers are analyzed. The results show that the horizontal deformation of station under liquefaction condition is larger when uses plain concrete as the material of conversion layer than to use graded gravel soils. The position where the maximum value of the vertical stress or horizontal stress of cushion occurs is nearly the same, location where the maximum value of the internal force of the underground structure occurs is also the same no matter it’s on the site of liquefaction or non-liquefaction. With the increase of the input peak value of ground motion, the stress of the conversion layer and the internal force of the underground structure on the liquefied site increase obviously which are much larger than that on the non-liquefied site. This study not only provides the basis for evaluating the feasibility of the project, but also offers reference for the construction of similar projects in the future. © 2017 15th International Conference of the International Association for Computer Methods and Advances in Geomechanics
关键词:
通讯作者信息:
电子邮件地址:
来源 :
年份: 2017
页码: 746-758
语种: 英文
归属院系: