收录:
摘要:
With the rapid development of economy and tourism, Dong Changyu tunnel which have single lane has been unable to meet the increasing traffic. Due to the terrain and geological conditions, it is unable to build a new one, there is only way to expand the existing tunnel. Based on blasting excavation of collapse cavity section, this paper analyzes rock fragmentation and blasting vibration of multi free surface. Using numerical calculation method with Lagrangian algorithm and full restart, it simulates the effect of blasting vibration on the reinforcement area of collapse cavity and the surrounding rock, and obtains vibration velocities and its law of characteristic points. Compared to the field experiments, the vibration velocities of numerical simulation are close to them. The results indicate that the numerical calculation method can descripts rock fragmentation and blasting vibration in the millisecond delay blasting. The research has reference and guidance for similar engineering. © 2016 Taylor & Francis Group, London.
关键词:
通讯作者信息:
电子邮件地址: