收录:
摘要:
According to precise delay blasting was used in the foundation excavation. The nonelectric detonator and electronic detonator were used in the blasting, the vibration which using electronic detonator area is smaller than the electronic detonator area; in the second blasting, there is only 20 m between blasting area and structure, the precise delay electronic detonator and hole-by-hole blasting were used, near the building set a row pre-splitting holes, Vibration monitoring results show that the trend of vibration signals to the high frequency part scattered which can reduce the harmful to the building. The blasting vibration response spectrum was analyzed. © 2013 Taylor & Francis Group.
关键词:
通讯作者信息:
电子邮件地址: