• 综合
  • 标题
  • 关键词
  • 摘要
  • 学者
  • 期刊-刊名
  • 期刊-ISSN
  • 会议名称
搜索

作者:

Wu, Yong-Yan (Wu, Yong-Yan.) | Wei, Zhong-Hua (Wei, Zhong-Hua.) | Rong, Jian (Rong, Jian.) (学者:荣建) | Liu, Xiao-Ming (Liu, Xiao-Ming.) (学者:刘小明)

收录:

EI Scopus

摘要:

The 29th Olympic Games was held in Beijing in 2008. Large number of spectators and tourists were attracted to the Olympic venue area. Providing access to pedestrian around Olympic venue area is a crucial issue. The objective of this paper is to study evaluation processes of pedestrian facilities around Olympic venue area. Comparing three evaluation methods reflects that simulation is the best approach. After comparing several pedestrian traffic simulation packages, Legion Studio is chosen. Based on simulation method, evaluation processes are developed. Pedestrian traffic demand forecast, evaluation period, simulation period, simulation area and other steps are studied in details. As an example, pedestrian traffic around an Olympic gymnasium was simulated. Improvements were recommended and effect was also simulated. Finally, the simulation results were compared to actual pedestrian traffic during the Olympic. © 2010 ASCE.

关键词:

Traffic control Facilities Transportation Civil engineering

作者机构:

  • [ 1 ] [Wu, Yong-Yan]Transportation Research Center, Beijing University of Technology, Beijing, 100124, China
  • [ 2 ] [Wei, Zhong-Hua]Transportation Research Center, Beijing University of Technology, Beijing, 100124, China
  • [ 3 ] [Rong, Jian]Transportation Research Center, Beijing University of Technology, Beijing, 100124, China
  • [ 4 ] [Liu, Xiao-Ming]Transportation Research Center, Beijing University of Technology, Beijing, 100124, China

通讯作者信息:

电子邮件地址:

查看成果更多字段

相关关键词:

相关文章:

来源 :

年份: 2010

卷: 382

页码: 1226-1236

语种: 英文

被引次数:

WoS核心集被引频次: 0

SCOPUS被引频次:

ESI高被引论文在榜: 0 展开所有

万方被引频次:

中文被引频次:

近30日浏览量: 1

在线人数/总访问数:1533/3896404
地址:北京工业大学图书馆(北京市朝阳区平乐园100号 邮编:100124) 联系我们:010-67392185
版权所有:北京工业大学图书馆 站点建设与维护:北京爱琴海乐之技术有限公司