收录:
摘要:
With the rapid growth of the motor vehicles in Beijing, the traffic jam situation is aggravated constantly. The function of SCOOT traffic signal control system has not gradually adapted to the actual traffic demand. After analyzing and researching the current situation and problems of existing SCOOT systematic operation in Beijing, the construction objects are put forward according to the traffic characteristics and system control characteristics within Second Ring Road in Beijing. Through choices of investigating route and intersections and investigating date and by using the method of before and after, a good effect is got and The operation status of the traffic has got very great improvement after the system was implemented, demonstrating the SCOOT system superiority of the single point control.
关键词:
通讯作者信息:
电子邮件地址: