收录:
摘要:
According to the formation parameters of No.3 coal seam in the Qinshui Basin, Shanxi Province, considering the interaction between seepage and deformation in the borehole wall of coal seam, the stable elastic-plastic numerical model of the borehole in coal seam was established using the finite element method, then the variation of pore pressure near the wellbore wall with the seepage time and the effect of time delay on wellbore stability under underbalanced drilling condition were studied. The variation influences of maximum displacement and maximum plastic deformation around borehole wall with bottom pressure were studied. The simulation results show that there is indeed a time delay effect on wellbore stability and the plastic analysis of coal and rock under consideration of seepage and deformation coupling conditions is more reasonable and effective, and it provides sufficient time conditions for guiding drilling construction. © Indian Pulp and Paper Technical Association. All rights reserved.
关键词:
通讯作者信息:
电子邮件地址: