• 综合
  • 标题
  • 关键词
  • 摘要
  • 学者
  • 期刊-刊名
  • 期刊-ISSN
  • 会议名称
搜索

作者:

Zhang, M. (Zhang, M..) | Zhang, Z. (Zhang, Z..) | Chen, F. (Chen, F..)

收录:

Scopus PKU CSCD

摘要:

A variety of construction problems, such as bad cutting effects of cutters, unreasonable boring parame- ters and blowout, are often encountered during shield tunnelling under unfavorable geological conditions. Aimed at these construction difficulties of high pressure, abundant underground water, fractured rock stratum, long distance and small-radius curves of Fuzhou metro, the mechanical behaviors of cutting tools were analyzed through theoreti- cal calculations of cutter cutting force, then the reasonable cutter configuration, tunneling parameters and the proper time for cutter replacement were presented. Some measures, such as screw conveyor renovation, mucking control and lowering of groundwater, were adopted for controlling blowout based on practice. The stability of excavation face was analyzed by numerical simulation, and the measures for shield boring and posture control in the long distance and small radius curved tunnels were summarized. The conclusions are as follows: 1) when shield machine is driven in fractured stratum, the effect of lateral impact force produced by spalling rock on cutter will be very large and rein- forcement is needed for cutter; 2) cutter replacement should be taken at proper time based on muck samples in con- ditions of increasing of total shield thrust by 4 000-7 000 kN, cutter torque by 1 000-1 500 kN•m and driving speed smaller than 10 mm/min; 3) adopting screw conveyor device with innovative anti-blowout devices and control measures for ground precipitation and mucking, it controls blowout effectively; 4) the maximum axis offset and the height offset of segment meet the requirements of shield construction specifications during shield construction of long distance small-radius curved tunnel. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.

关键词:

Blowout; Configuration of cutting tools; conveyor; curved tunnel; Driving parameters; Fractured stratum; High-pressure and abundant underground water; Innovation of screw; Replacement of cutting tools; Shield machine; Small-radius

作者机构:

  • [ 1 ] [Zhang, M.]Beijing Collaborative Innovation Center for Metropolitan Transportation, Beijing University of Technology, Beijing, 100124, China
  • [ 2 ] [Zhang, Z.]Beijing Collaborative Innovation Center for Metropolitan Transportation, Beijing University of Technology, Beijing, 100124, China
  • [ 3 ] [Chen, F.]The 6th Engineering Co.Ltd. Of China Railway 17th Bureau Group Co.Ltd, Fuzhou, 350014, China

通讯作者信息:

  • [Zhang, Z.]Beijing Collaborative Innovation Center for Metropolitan Transportation, Beijing University of TechnologyChina

电子邮件地址:

查看成果更多字段

相关关键词:

相关文章:

来源 :

Modern Tunnelling Technology

ISSN: 1009-6582

年份: 2018

期: 6

卷: 55

页码: 197-203 and 209

被引次数:

WoS核心集被引频次: 0

SCOPUS被引频次: 3

ESI高被引论文在榜: 0 展开所有

万方被引频次:

中文被引频次:

近30日浏览量: 1

在线人数/总访问数:722/3891352
地址:北京工业大学图书馆(北京市朝阳区平乐园100号 邮编:100124) 联系我们:010-67392185
版权所有:北京工业大学图书馆 站点建设与维护:北京爱琴海乐之技术有限公司