The successful completion of the Zhengzhou-Xi'an high-speed railway project has greatly improved the construction level of China's large-section loess tunnels, and has resulted in significant progress being made in both design theory and construction technology. This paper systematically summarizes the technical characteristics and main problems of the large-section loess tunnels on China's high-speed railway, including classification of the surrounding rock, design of the supporting structure, surface settlement and cracking control, and safe and rapid construction methods. On this basis, the key construction techniques of loess tunnels with large sections for high-speed railway are expounded from the aspects of design and construction. The research results show that the classification of loess strata surrounding large tunnels should be based on the geological age of the loess, and be determined by combining the plastic index and the water content. In addition, the influence of the buried depth should be considered. During tunnel excavation disturbance, if the tensile stress exceeds the soil tensile or shear strength, the surface part of the sliding trend plane can be damaged, and visible cracks can form. The pressure of the surrounding rock of a large-section loess tunnel should be calculated according to the buried depth, using the corresponding formula. A three-bench seven-step excavation method of construction was used as the core technology system to ensure the safe and rapid construction of a large-section loess tunnel, following a field test to optimize the construction parameters and determine the engineering measures to stabilize the tunnel face. The conclusions and methods presented here are of great significance in revealing the strata and supporting mechanics of large-section loess tunnels, and in optimizing the supporting structure design and the technical parameters for construction. (C) 2018 THE AUTHORS. Published by Elsevier LTD on behalf of Chinese Academy of Engineering and Higher Education Press Limited Company.

关键词:

Design load Loess tunnel Surrounding rock classification Three-bench seven-step excavation method Surface cracking

作者机构:

  • [ 1 ] [Zhao, Yong]China Railway Econ & Planning Res Inst, Beijing 100038, Peoples R China
  • [ 2 ] [He, Huawu]China Railway Corp, Beijing 100844, Peoples R China
  • [ 3 ] [Li, Pengfei]Beijing Univ Technol, Beijing 100124, Peoples R China

通讯作者信息:

  • 李鹏飞

    [Li, Pengfei]Beijing Univ Technol, Beijing 100124, Peoples R China

电子邮件地址:

查看成果更多字段

相关关键词:

来源 :

ENGINEERING

ISSN: 2095-8099

年份: 2018

期: 2

卷: 4

页码: 254-259

1 2 . 8 0 0

JCR@2022

JCR分区:1

被引次数:

WoS核心集被引频次: 78

SCOPUS被引频次: 83

ESI高被引论文在榜: 0 展开所有

万方被引频次:

中文被引频次:

近30日浏览量: 0

归属院系:

在线人数/总访问数:217/4744474
地址:北京工业大学图书馆(北京市朝阳区平乐园100号 邮编:100124) 联系我们:010-67392185
版权所有:北京工业大学图书馆 站点建设与维护:北京爱琴海乐之技术有限公司