收录:
摘要:
A bench-scale nitrogen and phosphorus removal membrane bioreactor (UCT-MBR) was operated to treat municipal wastewater in southern parts of Hebei province regarding on the influence of sludge retention time on the denitrifying dephosphatation propensity and membrane fouling behavior. Either shorter (15d) or longer (40d) SRT could deteriorate the accumulations of DPAOs; denitrifying dephosphatation was strengthened to the maximum degree under SRT of 25d, the ratio of the DPAOs to PAOs and anoxic dephosphatation efficiency reaching the maximum values of 50.8% and 88%, with TP,TN maximum removal efficiencies of 91.7%, 73.6% and effluents of 0.48, 13.3mg/L respectively. SRT had slight effects on the COD and ammonia removals, with average removal efficiencies of 88.9%, 99.7% and effluents of 30.8, 0.15mg/L respectively; with the prolonged SRT, the increase of MLSS concentration, the SMP < 1kDa, SMP > 100kDa concentration, EPS < 1kDa, EPS > 100kDa specific concentration and decrease of PSD resulted in the sludge filterability deterioration, accelerating membrane permeability decline and shortening of sustainable operational cycle, whereas FT-IR analysis of membrane surface foulants showed that SRT had no significant effects on the compositions and refractive index of infrared spectroscopy presented the consistence with the amounts of SMP and EPS. © 2016, Editorial Board of China Environmental Science. All right reserved.
关键词:
通讯作者信息:
电子邮件地址: