收录:
摘要:
This study tested the feasibility of plug-flow integrated fixed-film activated sludge (IFAS) reactor in applying sewage partial nitritation/anammox (PN/A) process. The IFAS reactor was fed with real pretreated sewage (C/N ratio = 1.3) and operated for 200 days. High nitrogen removal efficiency of 82% was achieved with nitrogen removal rates of 0.097 +/- 0.019 kg N/(m(3).d). Therefore, plug-flow IFAS reactor could be an alternative to applying sewage PN/A process. Besides, it was found that the stability of sewage PN/A process was significantly affected by residual ammonium. Nitrate accumulated in effluent and PN/A performance deteriorated when residual ammonium was below 1 mg/L. On the contrary, long-term stable PN/A operation was achieved when residual ammonium was over 3 mg/L. (C) 2017 Elsevier Ltd. All rights reserved.
关键词:
通讯作者信息:
电子邮件地址:
来源 :
BIORESOURCE TECHNOLOGY
ISSN: 0960-8524
年份: 2017
卷: 239
页码: 294-301
1 1 . 4 0 0
JCR@2022
ESI学科: BIOLOGY & BIOCHEMISTRY;
ESI高被引阀值:215
中科院分区:1