The simulation of forced deformation on retaining structure of an open-excavated subway station was carried out using the software FLAC3D, and a comparative analysis with field data was accomplished. The established numerical simulation methods are used to analyze the horizontal deformation of pile body in different pre-axial force loading schemes. The relationship between brace stiffness variation and retaining structure deformation and the relationship between variation of fender pile stiffness and retaining structure deformation were studied. Results show that 1) steel support pre-applied a reasonable axial force can prevent and reduce the deformation of retaining structure, and a recommended value is 80% of the design value of the axial force; 2) pit top horizontal displacement can be reduced by increasing the rigidity of the steel support in strict deformation requisition; and 3) the pile horizontal deformation will decrease obviously with the increase of fender pile diameter, and the effect will become inconspicuous when the pile diameter is to large. From the perspective of controlling pit deformation, structure designs should select an appropriate size of the pile diameter and take economic benefit into account.

关键词:

Field monitoring; Numerical simulation; Open-excavated method; Subway station

作者机构:

  • [ 1 ] [Zhang, M.-J.]The Key Laboratory of Urban Security and Disaster Engineering, Ministry of Education, Beijing University of Technology, Beijing 100124, China
  • [ 2 ] [He, H.]The Key Laboratory of Urban Security and Disaster Engineering, Ministry of Education, Beijing University of Technology, Beijing 100124, China
  • [ 3 ] [Li, C.-H.]The Key Laboratory of Urban Security and Disaster Engineering, Ministry of Education, Beijing University of Technology, Beijing 100124, China
  • [ 4 ] [Su, Z.-Y.]The Key Laboratory of Urban Security and Disaster Engineering, Ministry of Education, Beijing University of Technology, Beijing 100124, China
  • [ 5 ] [Liu, X.-J.]The Key Laboratory of Urban Security and Disaster Engineering, Ministry of Education, Beijing University of Technology, Beijing 100124, China

通讯作者信息:

  • 张明聚

    [Zhang, M.-J.]The Key Laboratory of Urban Security and Disaster Engineering, Ministry of Education, Beijing University of Technology, Beijing 100124, China

电子邮件地址:

查看成果更多字段

相关关键词:

相关文章:

来源 :

Journal of Beijing University of Technology

ISSN: 0254-0037

年份: 2013

期: 6

卷: 39

页码: 875-880

被引次数:

WoS核心集被引频次: 0

SCOPUS被引频次:

ESI高被引论文在榜: 0 展开所有

万方被引频次:

中文被引频次:

近30日浏览量: 2

在线人数/总访问数:1106/2906151
地址:北京工业大学图书馆(北京市朝阳区平乐园100号 邮编:100124) 联系我们:010-67392185
版权所有:北京工业大学图书馆 站点建设与维护:北京爱琴海乐之技术有限公司